1·Gushan anticline is the main controlling structure in Fengfeng mine district.
鼓山背斜是峰峰矿区的主控构造。
2·This system was adopted by an operator in his coal mine district design, and significant economic effects were gained.
该系统用于某煤矿采区的设计,得到了生产单位的采纳,取得了明显的经济效果。
3·The Paper has mainly expounded the indirect adjustment method in phases of traverse network in mine district by using the principle of correlated adjustment in phases.
本文阐述了矿区导线网采用相关平羞原理作间接分期平差的方法。
4·Its whiteness change law in the roasting process was studied and different additive for improving the roasted kaolin whiteness of this mine district were successfully found.
研究了煅烧过程中白度的变化规律,成功地找到了提高该地区煅烧高岭土白度较有效的添加剂。为进一步扩大实验和开发利用该区高岭土资源提供了依据。
5·The law of the mine pressure appearance is held by the mine pressure observation. A new road of the cantilever support application and expansion in Yuzhou mine district is explored.
通过矿压观测掌握了该工作面矿压显现规律,为今后悬移支架在蔚州矿区推广探索出一条新路。
6·Based on the field practice, some regularities of rock burst in Nantong Mine District are discovered and the practical prevention and governing measure are summarized in this paper.
在现场实践基础上,揭示了南桐矿区岩爆发生的某些规律,研究总结了岩爆实用防治技术措施。
7·This paper discussed the measuring results of a few geophysical methods to obtain its geophysical characteristic in the unknown exhausted area and sinking area of Yingcheng coal mine district.
讨论了在营城煤矿未知采空区及塌陷区运用多种地球物理方法测量的结果,得到该煤矿采空区及塌陷区的地球物理特征,从而为营城矿煤采空区及塌陷区的探查与判断提供参考。
8·According to the relation between hydrodynamic pressure fields causing by ship and its speed is close, the ship itself can be defended and pass the pressure mine district safely by limit the speed.
根据舰船水压场与航速关系密切的特点,可通过限速航行以实现舰船自身防护安全通过水压水雷区。
9·On July 7th a 29-year-old miner at the Kitaka gold mine in the Kamwenge district of western Uganda was admitted to hospital. He died on July 14th.
7月7日,有一位29岁的来自西部乌干达kamwenge地区Kitaka金矿的矿工住了院,并于7月14日去世。
10·Workers produce coke at an unofficial coal mine in Jharkhand's Hazaribagh district.
在恰尔肯德邦哈扎里巴格地区一座非官方煤矿提炼焦煤的工人。